Sanitation of existing landfills

Highlights of the National Fact Sheet
04/02/2020
Impact of uncontrolled waste dumpsite towards environment
05/03/2020
Show all

P&P offers you complete solutions for the sanitation / rehabilitation of the waste dumpsites.
With our technology EcoRoll®, we are sealing existing waste into balls.

Advantages:

  • Rapidity of installation, reduced dimensions of area.
  • Possible to start immediately
  • Transfer stations – Emergency answer
  • Small footprint, storage-site approvals for inner-city areas
  • Compacted = volume decreased ratio 3:1
  • Sealed = no leaking, no odor
  • Safely storage anywhere
  • Easy transportation
  • Temporary unit. When sanitation is done, could be moved to another location
  • Low cost

Figures:

  • Treatment of 300 tons of waste / shift
  • 100 000 t waste / year
  • 300 000 m3 / year
  • In 6 month, possibility of sanitation of a medium size waste dumpsite
  • Need a team of 5 people to operate 1 shift
  • Power: 70 kW
  • Approx. cost: 30 denars / hab / month
Balling Unit

Sanitation of existing dumpsite

Balling the waste

Balling the waste – Safe disposal

Transporting balls